Plan proposes to reinvent construction industry
Contents |
[edit] Introduction
A plan to ‘reinvent’ the construction industry, called ‘Roadmap to Recovery’, was released on 1 June 2020 by the Construction Leadership Council (CLC). The plan was developed by participants on the CLC’s coronavirus industry taskforce, which includes ECA CEO Steve Bratt, as well as representatives of BEIS and other trade bodies. It has three stages – restart, reset and reinvent – which aim to kickstart and modernise the industry over the next two years.
[edit] Three stages
The restart stage is all about providing support through the crisis and focuses on safety on projects, encouraging responsible contractual behaviour and prompt payment down the supply chain. The plan also calls for a delay of the introduction of reverse charge VAT until October 2021, which ECA supports.
The reset and reinvent stages look to drive demand, strengthen capability and transform the industry to deliver better value through collaboration and partnership.
ECA CEO Steve Bratt says, “Given the sharp decline in electrotechnical and engineering services activity, it is vital the industry works with Government to deliver a recovery plan which protects jobs, businesses and projects. This CLC recovery plan, agreed by a broad range of key bodies including ECA, sets out a three-stage roadmap to ultimately reinvent the industry. The first stage critically seeks to ensure cashflow, minimise disputes and most importantly, ensure work can be undertaken safely."
The reset stage of the plan proposes flexibility on apprenticeship levy payments, strengthening direct employment and a move towards fairer business models and contracts.
Looking further ahead, the reinvent stage has a series of modernisation ambitions, including a presumption for offsite construction, a series of net zero carbon targets between 2030 and 2050, modernised training methods and a commitment to more collaborative procurement models.
[edit] Outlook for engineering services
Steve Bratt adds, “The engineering services industry is critical to delivering key UK infrastructure. ECA has long advocated a more modernised, collaborative and sustainable industry. We hope these ambitious plans for the next two years will help set the foundations for a bright future.
“We have welcomed the opportunity to contribute to the development of this plan and we now look forward to supporting its implementation".
To read the full CLC recovery plan, please see this downloadable PDF: File:Roadmap-to-Recovery.pdf.
This article originally appeared on 1 June 2020 under the title, New recovery plan aims to ‘reinvent’ construction industry on the ECA website.
--ECA
[edit] Related articles on Designing Buildings Wiki
- A decade for heat pumps.
- Beyond the pandemic.
- Construction sites urged to integrate test and trace.
- Coronavirus.
- ECA articles.
- Engineering services and industry recovery guide.
- Engineering services bodies issue coronavirus site safety guides.
- England housing market resumes operations.
- Get ready for green jobs and upgrade projects.
- Mental health and wellbeing.
- National Retrofit Strategy NRS.
- Net zero and green jobs.
- New deal for infrastructure 2020.
- Re-starting construction in a COVID-19 environment.
- Skills for Climate consultation launched.
- Social distancing compliance marshal.
- Survey records business projections after coronavirus storm.
- The Construction Playbook.
- The future of the coronavirus furlough.
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.